Umahi Announces Completion Date For Lagos-Calabar Coastal Highway

Minister of Works, Senator Dave Umahi, has announced that the construction of the Lagos-Calabar Coastal Highway will be completed in January 2026, saying, “I assure you that by January next year, God willing, we have this road completed.”

Mr. Umahi made the disclosure during an inspection tour of the highway on Wednesday, stating, “We came to review the project with the financial promoters – Dutch Bank and Development Bank of Southern Africa.”

He said it was projected that 20km of the road (from Ahmadu Bello Way in Lagos) would have been completed by May, adding, “We are going to surpass the 20km from this site.”

Read Also: NJC Reverses Appointment Of Popular Judge, Suspends Three Other Justices

Mr. Umahi said that more than 70 per cent of the entire project had been done, stating, “Let me state that this project is over 70 per cent done, and the contractor has not got funds up to 70 per cent. That is why I call them people that have set their minds towards nation-building rather than making money.”

According to him, along the corridor, there are some lands that have been acquired for tourism, industries, factories and housing estates, saying, “These are the road architecture that you are going to receive on this highway.”

He said that the financial promoters of the highway were satisfied with the work progress, quality, method statement, and every other thing about the project.

He praised the contractor handling the project, Hitech Construction Company, for efforts, saying, “The road is exceptionally technically well-designed. The concrete thickness is designed for 275 millimetres but what they are doing is 280 millimetres. I commend also the department in charge of this project – the Department of Bridge and Roads, and, of course, the controller of works in Lagos.”

Mr. Umahi said that the greatest worry he could have would be motorists joining the highway ‘from their houses’, stating, “It is going to be a very serious issue; so, we have to design a barrier. I know that you are putting a retaining wall but you have not incorporated a retaining wall all through.”

He said that, as a superhighway, it would be expected that motorists would join it at flyovers and interchanges to avoid gridlock.

Join Informant Online WhatsApp Channel With Link Below: https://whatsapp.com/channel/0029VaihFajBadmT29ufud2

Related articles

States Predicted To Experience Above-Normal Rainfall

Based on a weather outlook from the Nigerian Meteorological...

Why I Will Serve Only One Term If Elected President – Peter Obi

Peter Obi, a former presidential candidate for the Labour...

Ighodalo Speaks On Alleged Defection

Dr. Asue Ighodalo, the PDP's governorship candidate in the...

Elephants Spotted In Ogun [VIDEO]

The video captures the moment Elephants were spotted at...

How Obi Can Win 2027 Presidential Election – Jerry Gana

Former National Chairman of the Peoples Democratic Party (PDP),...

LEAVE A REPLY

Please enter your comment!
Please enter your name here